Built-Up Area (sq.ft): Total covered floor area across all floors including wall thickness and balconies.
PCC (Plain Cement Concrete): A flat, non-steel concrete layer poured at the bottom of excavated pits to create a clean, level base before placing steel footings.
RCC (Reinforced Cement Concrete): Concrete strengthened with steel bars (TMT) used for footings, columns, beams, and roof slabs.
TMT Steel (Fe550D): High-strength ribbed steel rods that give concrete tensile strength so the building resists bending and earthquakes.
Shuttering / Formwork: Temporary steel plates, plywood, and vertical props (Cuplock/H-frames) used as molds to hold wet concrete until it hardens.
MEP (Mechanical, Electrical & Plumbing): All concealed electrical wires, distribution boards, water pipes, drainage lines, bathrooms, and AC/firefighting systems.
Ancillaries & Overheads: Essential non-structural site expenses such as soil testing, temporary site shed, water tankers, temporary power connection, scaffolding transport, site engineer salary, and 24/7 security guard.